| | | |
 |  |  |  |
|
30 kilo outside.
|
30 Kilo roaster.
|
afterburner being placed.
|
afterburner in place.
|
| | | |
| | | |
 |  |  |  |
|
assambling destoner.
|
backing into building.
|
build up.
|
burner inlet on roaster.
|
| | | |
| | | |
 |  |  |  |
|
chaff can finial spot.
|
Chaff fist location.
|
cleaning with brute force.
|
control cabnet.
|
| | | |
| | | |
 |  |  |  |
|
control face.
|
cooling stack and afterbuner wye.
|
cooling tray.
|
destoner top.
|
| | | |
| | | |
 |  |  |  |
|
destoner.
|
drive roaster.
|
duct work on 60 kilo.
|
fisrt load of coffee.
|
| | | |
| | | |
 |  |  |  |
|
fixing shaft.
|
front veiw of 60 kilo.
|
front veiw of roaster.
|
green chaff can.
|
| | | |
| | | |
 |  |  |  |
|
green coffee.
|
green hopper slide.
|
green loader.
|
guiding into place.
|
| | | |
| | | |
 |  |  |  |
|
how to put stack together.
|
inside destoner.
|
installing stack top.
|
leveling roaster.
|
| | | |
| | | |
 |  |  |  |
|
lifting afterburner.
|
moving roaster with pipe.
|
moving the roaster.
|
on the trailer.
|
| | | |
| | | |
 |  |  |  |
|
outlet for stack.
|
parts.
|
picture of control cabnet.
|
plant veiw.
|
| | | |